Kong's house, December 2009

Thanks to everyone interested in this project. For a description of the project, see first blog entry. - Tomoko

Summary

1/24/10 $450 wired for work on the concrete floors. Floors are finished now.
1/15/10 Sent email to friends about blog
1/12/10 Created House of Kong blog
1/11/10 Called Kong. Got more background info. and history
1/11/10 $200 wired for starting work on floors. An engineer/construction worker is scheduled to start on Jan. 15
1/1/10 Naoto tells me the story of Kong
12/31/09 Naoto returns from Laos

Sunday, January 17, 2010

Work on house resumed!

After being on hold for a while, they have started working on the floor. Plumbing will be put in place and then a concrete floor will be poured. Here they are preparing the area. These pictures were taken with Kong's cell phone camera on Jan 16th & 17th. (Sorry can't get the format right so picture are side-by-side and not all vertical line)

1